Getting Ready
(pictures by Mom) |
|
 |
 |
 |
 |
| |
|
|
|
|
 |
 |
 |
 |
| |
|
|
|
Dad supervising the
Job |
 |
 |
 |
| |
|
|
|
The Pour
6 yds of dirt +
another 6 or so that Steve rounded up around the property
6 yds of Concrete,
lots of rebar, wire mess and SWEAT.
Good thing Steve had
all the concrete tools - saved $ to have to rent them, not to count his
expertise and his crew was a HUGE benefit! |
|
 |
 |
 |
 |
|
|
|
|
|
|
We started at the
bottom ramp, then up between the garage & house, then the center section -
not planned that way but the Concrete truck came early (10:30 instead of
11:00am) and the lower section was all that was ready |
|
 |
 |
 |
 |
|
|
|
|
|
|
 |
 |
 |
 |
|
|
|
|
|
|
 |
 |
 |
 |
|
|
|
|
|
|
 |
 |
 |
 |
|
|
|
|
|
|
 |
 |
 |
 |
|
|
|
|
|
Almost Done |
|
|
 |
Sammy & His Truck
leaving after 1 hour and 15 minutes of pour |
|
|
|
|
|
 |
 |
 |
|
|
|
|
|
|
|
 |
 |
|
|
|
|
|
|
The Ramp, as viewed
from the Carport |
|
 |
 |
 |
 |
|
The landing between
the house & garage where a door will replace the window |
|
 |
 |
 |
|
Standing inside, on
the landing looking out |
|
|
 |
 |
|
| |
|
|
|
Joining the Old Steps
to the New Ramp |
| |
 |
 |
|
|
 |
 |
 |
 |
|
The concrete is now
done
all that is left is
installing the door and adding handrails |
Adding the Handrails |
|
Before the Handrails |
 |
 |
09/04/02 The
Handrails are almost done - still have to add the right side. I also
added a step, where Dad is standing |
|
|
|
|
|
|
09/11/02
Step
has been removed along with step handrails and continuous handrails were
added all the way up both sides - JUST FOR VA purposes |
 |
 |
09/11/02
same
photo but with Dad taken out of the picture |
|
|
|
|
|
|
09/14/02 - latest
Handrails were
extended to porch along with removing the diagonal wood handrails to porch
the expansion board
was added between the lower landing and the ramp start |
 |
|
|
|
|
|
|
Before door & cleanup |
 |
 |
9/04/02 Top
Landing - gee, no leaves, light bulb removed, along with holes, wires and even the edge of the
door has been added |
|
|
|
|
|
|
9/11/02
Step
has been added and the remaining leaves were swept up - also cropped it on
the left to make the photo more eye appealing |

|
|
|
|
|
|
|
 |
9/14/02 - latest
Step was reduced in
width & increased in thickness
vertical boards to the
right of the steps were removed |
|
|
|
|
|
|
Here is what the ramp
would look like with the step & rails off the left side. |
 |